top of page
Micro Hydro Scheme Scotland Case Study: Balintombuie
Micro Hydro Scheme, Glenmoriston, Scotland
Balintombuie is a 50kW micro hydro scheme developed by Proterra Energy on the Allt Bail' an Tuim Bhuidhe river in Glenmoriston.
Alongside the feasibility, design and build of the scheme, Proterra Energy was able to manage and source the funding for the entire project.
The scheme now provides the client and investors with annual revenue with Proterra Energy providing system management, maintenance and monitoring.
Commissioned:
Power:
Turbine:
Head:
Flow:
Location:
Balintombuie Micro Hydro Scheme Specifications
2016
50kW
Turgo
96m
76 l/s
Glenmoriston
bottom of page